0% The test starts the moment you click on the Start button. You may work on your test until the time allotted for it ends. Duration: 1 hours 30 minutes Your time is up! Your test is submitted automatically whether you’re finished or not. Well Control Drilling Well Control Introductory The number of attempts remaining is 4 Please fill your information FULL NAMEEmailPhone Number 1 / 30 1. Where is the Choke located? a. At the Choke Manifold b. At the Standpipe manifold c. At the Drilling Spool d. Connected to Ram outlet 2 / 30 2. Mud monitoring equipment such as PVT and pit alarm systems, trip tanks, and trip records should be used: a. Any time the well is open and fluid is circulated through mud tanks and on trips b. Only in production formations c. Only in deeper formations d. Only in production and abnormal pressure formations 3 / 30 3. What should happen to the trip tank mud level when pulling out of the hole? a. Mud level should increase b. Mud level should decrease c. Mud level should stay constant 4 / 30 4. What is meant by Accumulator Precharge Pressure? a. Pressure when Accumulators have hydraulic fluid b. All of the above c. Pressure of Nitrogen in Accumulator without hydraulic fluid d. Pressure at which Accumulator Pumps start 5 / 30 5. Why is the Mud Weight measured at the Shakers at regular intervals? a. To measure the gas content in the mud b. To weigh the volume of cuttings in the mud c. To check for contamination of the mud returns d. To record on the Mud Engineer daily report 6 / 30 6. What is a 'function' test on the BOPs? a. Test to check formation strength b. Test to check BOPS are holding pressure c. Test to check wellhead strength d. Test to check Bops are operating 7 / 30 7. Why are shallow kicks dangerous? a. Mud weight required to kill are always very high b. They create very high shut-in pressures c. Less time to react due to depth of the kick d. Shallow kicks always contain dangerous amounts of H2S 8 / 30 8. What type of kick can give a large increase in pit level and potentially cause the pits to overflow? a. Oil and water mix b. Oil c. Gas d. Water 9 / 30 9. Gas entering the wellbore will reduce hydrostatic pressure. This will be greatest when gas bubble is: a. At the surface pipe b. At the casing shoe c. At the bottom 10 / 30 10. Which of the following is an advantage of using the hard shut-in? a. It works for all types Of formations b. It reduces the amount of pressure surge on equipment c. It is the safest shut-in method d. It is the fastest way to get the well shut-in 11 / 30 11. Which of the following is a key role of the crew immediately after a well has been shut-in while drilling? a. Calculate Kill Mud Weight b. Select slow pump rate to kill the well c. Check for BOP leaks d. Choose method to kill the well 12 / 30 12. What should happen to the trip tank mud level when pulling out of the hole? a. Mud level should decrease b. Mud level should stay constant c. Mud level should increase 13 / 30 13. You are drilling ahead and get a 'drilling break'. You check for flow and the well is flowing. Which barrier has failed? a. Mud Filter Cake b. Wellhead or Casing Head seals c. Mud hydrostatic d. Cement around the casing 14 / 30 14. It is important for the Driller to know when mud is being transferred into or out of the active system so that he will: a. Know when to measure mud weight and viscosity. b. Know when to operate the pit agitators to prevent barite falling out of the mud. c. Know when to Start the centrifuge. d. Recognize gains or losses due to a kick or lost circulation. 15 / 30 15. Where is the Choke located? a. At the Standpipe manifold b. Connected to Ram outlet c. At the Choke Manifold d. At the Drilling Spool 16 / 30 16. The main reason to shut a well in quickly is: a. To minimize the shut-in drill pipe pressure. b. To minimize the size of the kick taken. c. To minimize the time spent on the choke. d. To minimize the amount of mud weight increase needed. 17 / 30 17. Slow Pump Rate/Circulating Pressure tests are carried out: a. With the well shut in on a kick b. During drilling operations c. During a kick operation 18 / 30 18. If a slug of heavy mud is pumped into the drill pipe before tripping, what will happen to bottom hole pressure (BHP)? a. BHP will increase due to heavy slug b. BHP will decrease due to drop in mud level in the drillstring c. BHP will stay the same, as hydrostatic pressure will balance out between annulus and drillstring 19 / 30 19. Given the following information, calculate the volume inside 100 stands of drill pipe. a. 242 bbls b. 93 bbls c. 167 bbls d. 75 bbls 20 / 30 20. The main reason to shut a well in quickly is: a. To minimize the time spent on the choke. b. To minimize the shut-in drill pipe pressure. c. To minimize the size of the kick taken. d. To minimize the amount of mud weight increase needed. 21 / 30 21. Which of the following are reasons why kicks occur? a. The additional ECD on the formation is too high after the pumps are shut off causing a reduction in the hydrostatic fluid column in wellbore. b. Formation Pressure is greater than Mud Hydrostatic Pressure. c. If the fluid density is too high after pumping a slug allowing a kick to enter the wellbore. 22 / 30 22. Why are shallow kicks dangerous? a. They create very high shut-in pressures b. Mud weight required to kill are always very high c. Less time to react due to depth of the kick d. Shallow kicks always contain dangerous amounts of H2S 23 / 30 23. What is the definition of Bottom Hole Pressure? a. Pounds per square inch b. Loss of mud to formation c. None of the above d. Total pressure acting on the bottom of the well 24 / 30 24. Which of the following is the best answer for what should be done after completing any type of drill? a. Let the company man know that a drill was done and then record it b. Let the company man know that a drill was done c. Record that a drill was done and review the drill with the crew d. Record and review the drill with the crew and let them know the time and date of the next drill 25 / 30 25. The safest way to transfer mud into the active system is to stop drilling, circulate and monitor the pit level increase: a. True b. False 26 / 30 26. Given the following information, calculate the volume inside 100 stands of drill pipe. a. 167 bbls b. 75 bbls c. 93 bbls d. 242 bbls 27 / 30 27. At the beginning of a kick, there is: a. An increase in mud flow and volume b. An increase in pump pressure c. Slower drilling rates d. No warning 28 / 30 28. The safest way to transfer mud into the active system is to stop drilling, circulate and monitor the pit level increase: a. False b. True 29 / 30 29. What pressure should be kept constant while killing a well? a. Pump pressure b. Bottom hole pressure c. Choke pressure d. Casing pressure 30 / 30 30. Which of the following is an advantage of using the hard shut-in? a. It is the fastest way to get the well shut-in b. It works for all types of formations c. It is the safest shut-in method d. It reduces the amount of pressure surge on equipment Your score is 0% Restart quiz Rate it! See review Send feedback